Skip to content
Office

Office Planner feature

Subtasks

Split a task into steps. Each subtask is a full task with its own assignee, due date and comments.

Real tasks, one level down

Add as many subtasks as you need. Each one has its own assignee, due date, description, comments and attachments. The parent shows a counter such as 2/5 on its row and card, and in the list view you can expand a task to see its subtasks as rows. Turn a subtask into a regular task, or a task into a subtask, whenever the shape of the work changes.

The details people trip over

Completing a parent with open subtasks asks "Also complete 3 subtasks?". A subtask assigned to you shows in My tasks with its parent's name, even if you aren't in that project. Moving or trashing a parent takes its subtasks with it, and restoring brings them back. Subtasks show on the calendar and timeline only when they have dates and you turn on Show subtasks.

Example

One blog post, four people

"Holiday gift guide" is a single task on the content board. It has four subtasks: research products (Mia, due Nov 28), write the draft (Joel, Dec 2), product photos (Ana, Dec 3) and final edit (Mia, Dec 4). The card shows 1/4 after Mia finishes her research, and each person sees only their own step in their task list.

How to set it up

  1. 1

    Open a task and click Add subtask, or paste a list to make several at once.

  2. 2

    Give each subtask an assignee and a due date.

  3. 3

    In the list view, click the counter on a row to expand its subtasks.

Subtasks is part of Office Planner and included on every plan.

Try Office Planner with your whole team

7-day trial with every feature. Cancel from the billing page whenever you like.